Return to BIOS Table of Contents

Return to BIOS 1722 Table of Contents

Additional Information Concerning the Fischer-Tropsch Process and its Products

Introduction

In the March, April and May of 1945 the Fischer-Tropsch plants and research institutions were investigated by joint British-American teams sponsored by the Ministry of Fuel and Power and the U. S. Technical and Industrial Intelligence Committee.  In the course of these investigations a very large number of documents relating to the Fischer-Tropsch process were collected and brought back to London for detailed study. As a result of this study and from an examination of the Field Team Reports of the original and subsequent investigations, it was found that there still existed a number of gaps in our information concerning the operation and development of this process in Germany.  There was a lack of detailed cost information for the operation of the process at the more efficient plants, and many of the important details of plant operation and of the research work on iron catalysts were either missing or inadequately reported. Further information was required concerning the refining and properties of the waxes produced in the process and on certain aspects of the production of synthetic fatty acids and detergents from the primary products.

The information reported herein was obtained as a result of investigations carried out with the object of making good these deficiencies.

In many cases information on the same point was sought from several targets, but as all the targets have been previously assessed and there is not therefore any interest in the targets per se, this report has been written on a subject basis.

Documents which were obtained in the course of the investigations are listed and described at the end of this report. The small numbers in the text refer to these documents.

Production of Synthesis Gas

On being asked about the various processes actually in use, or proposed, for the production of synthesis gas, Ruhrchemie said that they could give no better general account than that already published by A. Than in Oel and Kohle, 1942. p. 589-765. This has to do with the technical aspects. The costs of preparing synthesis gas by these processes are compared in Bruckner's "Handbuch der Gasindustrie" Vol. 12 Part II p. 58 (1940), the data being taken from papers by W. Schultes, Gluckauf, 1936, 72, 273 and F. Martin, Chem. Fabrik, 1939, 12, 233.

All the synthesis plants in Western Germany obtained their synthesis as by mixing water-gas with a gas richer in hydrogen gas to the water-gas shift reaction to give the so-called converted water-gas. More details on these processes were therefore available.

Water-Gas Generation

The water-gas plant of Ruhrchemie was the first plant constructed by Demag and it gave a great deal of trouble on account of corrosion in the stack, which was unlined. This was not limited to Ruhrchemie, because the Koppers water-gas plant built for Rheinpreussen worked so badly that a new plant had to be installed free of charge by the makers under the terms of the guarantee.  Again the trouble was due to corrosion in the stack which had to be lined in the never generators. At the moment Rheinpreussen consider the Demag generators are better than their own Koppers generators.

Even when the water-gas plant is running well, it is essential to have a uniform supply of coke if a constant supply of gas of constant composition is to be obtained. Ruhrchemie were particularly badly placed in this respect as they obtained their coke from five different firms. Essener Steinkohle, on the other hand, were ideally placed, because the mine, the coke-ovens and the synthesis plant were on the same site and under the same management. The synthesis plant was, in fact, specially built to absorb the coke produced as it was not very suitable for metallurgical purposes.

The efficient working of the generator plant is the most important step in the whole synthesis process from the point of view of thermal efficiency, and the much better thermal efficiency of Essener Steinkohle as compared with Ruhrchemie is largely due to this factor. Thus, for example, Ruhrchemie employed 100 men for running repairs on the generator plant whereas Essener Steinkohle only needed 30. For efficient working adequate reserve is necessary, and although Essener Steinkohle had eleven generators, ten in use and one in reserve, they would have preferred twelve, ten in use, one in reserve and one being repaired.

The stream consumption by the water-gas plant is by no means constant, and in the case of Essener Steinkohle, this accounts for the item in the cost statement in Table 26, showing steam taken from the colliery, although there are items in the same statement for steam sold to the colliery.

The detailed costs for the production of water-gas by Ruhrchemie in 1943-4 are given in Table 1, and a comparison if the data given there with the corresponding English costs should be useful in converting other German synthesis costs for the same period, as given in this report, into present-day English costs. The table does not include capital charges, but these can be estimated from the capital costs of the various items of the plant concerned which are as follows:

RM

East Generator Plant

3,067,946

Machine Shop for Water-gas Plant

427,087

West Generator Plant

4,147,211

Ash Disposal Plant

134,701

Water-gas Holder, 20,000 cu.m.

358,300

Settling Pools

98,587

Cooling Plant

264,909

The Production of Cracked Coke-Oven Gas,

Rheinpruessen prepared their synthesis gas both by adding cracked coke-oven gas to water-gas, and by making the adjustment in composition with converted water-gas. They say that the former method is the better one, on economic grounds. They also say that in general it is better to perform the cracking in a separate unit and not in the generator, for two reasons. Firstly, because the temperature in the generator is not high enough to cause complete cracking of the methane. Thus only some 60% of the methane is cracked at 1200ºC. and a temperature of 1300º. is necessary to crack 95%. If the generator is worked at a rather higher temperature than normal so as to get sufficient cracking of the methane, the costs increase as the lining of the generator disintegrates quicker and re-lining has to be done more frequently. The second reason is that undesirable resin-forming constituents of the coke-oven gas will pass through the generator at 1200°C. unchanged, while they are completely destroyed at 1300°C. in an external cracking unit. For these reasons Rheinpreussen changed over from internal to external cracking.

Conditions at the Essener Steinkohle plant were rather exceptional, as a result of which that company found it better to crack in the generator at 1100 - 1200°C. in spite of the above considerations. Being a new plant of good design, their coke-oven installation gave a gas containing an abnormally high proportion of hydrogen (see Table 14) so that a very complete cracking of the methane is unnecessary and in practice only some 40 - 50% of it was cracked. Moreover, they prefer to leave some methane as diluent in the synthesis gas, because than the residual gas from the synthesis can be sold very profitably as town's gas on account of its high methane content (see credit items in Table 26). As far as they know, this methane has no effect on the synthesis.

For costs of making synthsis gas from water-gas and cracked coke-oven gas, see Table 26.

Water-Gas Conversion

Ruhrchemie prepared their synthesis gas from water-gas in this way, and the following information was supplied by them about the process. They originally thought that their process for the purification of the gas from organic sulphur compounds would be unfavourably affected by gas rich in carbon monoxide, and they mixed the converted water-gas with the main stream of water-gas before passage through the above mentioned purification system. This was found to be unsatisfactory, however, as there was incomplete mixing of the converted gas and the water-gas, the two passing down a wide pipeline in two separate streams. Thus one or another of the purification units could be exposed to converted gas only and as this contained no oxygen - the oxygen originally added being used up in the conversion step the purification was unsatisfactory.

As a result, they re-examined the whole position, found that the purification system for the removal of organic sulphur compounds worked perfectly well with water-gas, and hence they passed all the water-gas through it before branching off a fraction for conversion by the water-gas shift reaction.

Various catalysts were used for the conversion but the brown oxide catalyst supplied by the I. G. Farben consisting of a mixture of iron oxide and chromium oxide, was the usual one. The catalyst was arranged in a reactor of 3.2 m. diamter, in four layers, each 750 mm. high. The reactor contained 26 - 28 t. catalysts. A heat exchanger with 1400 sq.m. surface was built beneath the reactor and the height of the combined unit was 14.5 m. The water-gas was first saturated at 70° C. in a tower 2.40 m. diameter and 27m. high, using the water from the cooler placed after the reactor. A steam injector, using steam at 9 atm. was used to supply the requisite water vapour for the reaction and to pass the gas forward into the heat exchanger. The converted gas, on leaving the reactor, was passed through a cooler, of 3.10 m. diamter, 27 m. high, filled with five layers of Raschig rings, and finally passed out of the plant at 25 - 30°C. Both in the cooler and in the saturation tower hydrogen sulphide is liable to be formed by the action of bacteria on calcium sulphate in the water, and since the converted water-gas does not pass through any purification plant before reaching the synthesis catalysts, this formation of hydrogen sulphide must be suppressed. This was done by keeping the water free from sulphate by recirculating it through a separate cooling tower. If for any reason this recirculation was interrupted, the bacteria were controlled by adding a little zinc chloride to the water.

For the catalyst employed, the wtaer-gas shift reaction starts at 370°C., but the temperature actually used was from 420 to 480°C. After the second layer of catalyst, condensate water, free from residues, was sprayed in to control the temperature, the reaction being exothermic, and the save steam. The necessary excess of steam increases with the temperature.

If no spraying were done at this stage and if the incoming water-gas were not saturated with water vapour, the steam consumption was 0.8 - 1.0 kg./cu.m. water-gas, whereas by working the process as desrcibed this was reduced to 0.6 - 0.7 kg./cu.m. The spraying must not be done, however, if condensate water containing less than 2 - 5 mg./litre is not available, because otherwise the catalyst rapidly becomes checked with scale from the water.

When a new charge of catalyst is brought into use, it is first heated to 370 - 400°C. with hot flue gases and then the water-gas and steam admitted. Reduction occurs and after a few hours the catalyst works normally. If the reaction on this catalysts had to be interrupted for any length of time it was found best to oxidize it with a mixture of nitrogen and air, or if this were not available, steam and air, before restarting. During use the catalyst slowly disintegrated and after two years had to be taken out and sieved. After recharging it lasted another 1 - 2 years.

Each unit, as described, converts 6,000 N . cu.m. water-gas/hour, and Ruhrchemie had five such reactors, two saturation towers, and three coolers (2 in use, 1 in reserve). The plant was built by Bamag-Meguin A.G., Berlin. Its performance can be judged by the following data for the year 1943-44.

The water-gas plant produced 59,000 cu.m./h. and after purification 16,000 cu.m./h. of this gas was taken out of the main stream and passed through the water-gas conversion plant, which yielded 21,100 cu.m./h. converted gas. Part of this was compressed, passed through a plant for washing out carbon dioxide, and mixed with compressed purified water-gas to give synthesis gas for the medium pressure synthesis. The remainder was mixed with the unconverted water-gas to give synthesis gas for the atmospheric pressure synthesis. Analyses at the various steps are shown in Table 2.

The cost of the water-gas conversion was 0.20 Rpig./cu.m. synthesis gas, exclusive of capital charges.

Production of Synthesis Gas Directly from Brown Coal.

Brabag had one Didier plant of capacity 35,000 cu.m./h. and seven Koppers plants, each of capacity 30,000 cu.m./h. Both gasified brown coal briquettes, but in addition to this fuel, coke was also required to make producer gas for underfiring the Koppers plant.

The Didier plant was not very satisfactory because the brick chambers always tended to leak, but it served as a good standby when the Koppers plant was out of order. The gas produced in it was more expensive than the Koppers gas and contained four times as much condensate.

The Koppers plant was the main source of gas, which it produced at about 0.7-0.8 Rpfg./cu.m . The chief trouble was that the brown coal briquettes disintegrated in the generator if they contained too much moisture, and so formed dust which blocked the slots through which the gas left the generator, in this way stopping the gas production from that generator completely. This could be avoided by altering the position of these slots and increasing the size of the top of the generator, but it was too expensive to alter the existing generators in this way. In the middle of 1943 Brabag specified that the brown coal should only contain 5-15% moisture before briquetting and in this way the dust trouble was avoided, but the price of the briquettes was increased from 9 to 12 RM/t.

Lurgi Pressure Gasification

The production of synthesis gas from brown coal by this process has already been described in detail elsewhere adn the only new fact brought to light was that little progress had been made during the war years with the newer method in which the ash is withdrawn in the liquid state.

A statement by Lurgi of much greater interest from an English point of view was that they had prepared synthesis gas directly from bituminous coal and anthracite by their process, full scale trials lasting several weeks having been carried out. The data given in Table 3 are based on the trials with bituminous coal, and the calculations were made for a plant to produce 132,000 N. cu.m. synthesis gas/hour, which would be required for a synthesis plant to produce 150,000 t. products/year.

In considering the results given, the figure of 4% given for the methane gas is too low, and for large works practice it might well be 6-7%, because the control of the individual generators would then be less accurate. This extra methane is really no disadvantage as it makes the residual gas from the synthesis more valuable as town's gas (see p.5.) If it is desired, the methane can be cracked in the generator by working at a rather higher temperature, but then as much oxygen is needed for the Winkler generator.

Table 3.

Synthesis Gas from Bituminous Coal by the Lurgi Process.

I. Technical Data.

1.Composition of the Coal:

Size

2-30 mm

Tar

1%

Ash

4%

Volatile Matter

10%

Gross Calorific Value

8100 kg. - cal./kg.

2.Composition of the Synthesis Gas:

CO2

1.0%

O2

0.1

CO

31.4

H2

62.0

CH4

4.0

N2

1.5

Inert Free Gas

93.4

Gross Calorific Value

3220 kg. cal/kg.

3.Production Data and Materials Used:

a) Gas Production

132,000 N. cu.m/h.

b) Coal used

520,000t./year = 62.0 t./h.

c) Oxygen used

0.19 N.cu.m. pure 02/N cu.m. synthesis gas = 25.100 N.cu.m./h.

d) Steam for Gasification for Heating

1.1 kg/N.cu.m. synthesis gas
145 t./h.
10
155"

e) Energy for Gas Production

200 kw

Charging the coal

70"

Cooling-water pumps

370"

Air compressors

10,300"

Oxygen compression

2,940"

High pressure air compression

1,100"

Ammonia compression

120"

Cooling-water pumps

120"

Other machines, and lighting

180"

Pressure water pumps (in the event of failure of a water turbine)

8,500"

f) Cooling Water

2,400 cu.m./h.

Cooled water for gas cooling for O2 plant

1,200"

Fresh Water

180"

Effluent Water

96"

4. Amount of Plant:

a) Oxygen Plant

Air turbo-compressors

3 in use 1 in reserve

Oxygen turbo-compressors

3 in use 1 in reserve

Separating Plant

7 in use 1 in reserve

b) Gasification

Gas Generators

22 in use 2 in reserve

Cooler

10 in use

Superheaters

4 in use

c) Pressure Water Washers

20 in use

Pressure Washing Towers

4 in use

Pumps

4 in use

Aeration Towers

4 in use

5.Personnel

Manager

1

Engineers

2

Foremen

4

Laboratory Assistants

4

Fitters

Gasification Plant

4 x 2 = 8

Oxygen Plant

4 x 4 =16

Pressure Water Washer

4 x 2 =8

Labourers

Gasification Plant

4 x 12=48

Oxygen Plant

4 x 4 = 16

Pressure Water Washer

4 x 4 = 16

General

4 x 5 = 20

6. Price of Raw Materials

Coal (in the bunkers)

14 RM/t.

Fresh Water

6 Rpfg./cu.m.

Purification of Effluent

0.50 RM/cu.m

a) Without Washing

b) With Pressure Water Washing

Steam, 80 atm.

2 RM/t.

2RM/t.

Electric Power

2 Rpfg./kwh

2 Rpfg./kwh

7. Wages and Salaries

RM

RM

Management (a proportional amount)

25,000

30,000

Engineers

10,000

12,000

Laboratory Assistants

9,000

10,000

Fitters

72,000

96,000

Labourers

184,800

220,000

313,800

384,000

II. Cost of Construction of the Whole Plant.

16,882,000  20,198,000

III. Working Costs.

RM

RM

a) Coal 520,000 t.

7,280,000

7,280,000

b) Cooling-Water 180 x 8,400 cu.m.

91,000

91,000

c) Purification of Effluent 96 x 8,400 cu.m.

403,000

403,000

d) Materials and Repairs, without wages, 3.5% of capital cost

590,000

590,000

e) Wages and Salaries

331,000

404,000

f) Capital Charges Amortization, 9% of capital cost Interest 5% of capital cost

1,520,000
845,000

1,816,000
1,010,000

g) Steam 155 x 8,400 t.

2,600,000

2,600,000

h) Electric Power 2,380 x 8,400 kwh.
13,180 x 8,400 kwh.

400,000

2,215,000

Credit for Methane

14,063,000
836,000

16,525,000
836,000

13,227,000

15,689,000

IV. Gas Production Costs.

A) Without Cracking Residual Gas.

a) Production costs for 1 N. cu.m. synthesis gas compressed to 9 atm., but without the cost of removal of CO2:

1.2 Rpfg./N. cu.m.

b). As above, but including the CO2 removal: 1.41 Rpfg./N.cu.m.

c). As above, but with the compression costs of 0.25 Rpfg./N.cu.m. deducted:
1.16 Rpfg./N.cu.m.

B) With Cracking of Residual Gas

a) Without Removal of CO2:

RM

Working Costs for Cracking

816,000

Compression of Cracked Gas

866,000

Working costs for Gasification Plant

14,063,000

15,745,000

Production Costs for Synthesis Gas compressed to 9 atm.
1.08 Rpfg./N.cu.m

b)

With removal of CO2

Working Costs for Cracking

816,000

Compression of Cracked Gas

866,000

Working costs for Gasification Plant

16,525,000

18,207,000

Production Costs for Synthesis Gas compressed to 9 atm.
1.25 Rpfg./N.cu.m

c) Production Costs for Synthesis Gas, without compression 1.00 Rpfg./N.cu.m.