Return to Table of Contents

9. Cost of New FT Plants.

(See also reference I(1)/7 at end of this section).

It is interesting to note German figures on the cost of Fischer synthesis plants. The following data was obtained from Lurgi; (Basis 100,000 T/year plant).

Synthesis section and recovery   400 RM/ton year product.

This based on newest Fe catalyst using Kreislauf and Staging.

Complete Unit including Gas generator 900 RM/ton year product.

These costs are high compared with the following figures from I.G. based on Cobalt multiple stage operation without Kreislauf:

Synthesis section and recovery

290 RM/ton, year product

Complete unit including generator

basis coke:   

  590 RM/ton, year product

Complete unit including conversion

basis natural gas:   

 500 RM/ton, year product

The I.G. figures are based on 180,000 T/year capacity. When the plant size is reduced to 100,000 ton/year the cost of the complete unit (basis coke) is increased to 615 RM/ton, year product.