Section 1
556kb |
1 |
Introduction |
1-1 |
| |
Purpose of Study |
1-1 |
|
2 |
Basis of Design and Assumptions |
2-1 |
|
3 |
Plant Configuration |
3-1 |
|
4 |
Overall Plant Design |
4-1 |
| |
|
Overall Description |
4-1 |
| Listing of Units |
4-2 |
| Feed and Products |
4-3 |
| Thermal Efficiency |
4-4 |
Section 2
950kb |
5 |
Process Descriptions |
5-1 |
| |
|
Unit 01 - Coal Preparation |
5-1 |
| Unit 11 - Air Separation |
5-5 |
| Unit 21 - Coal Gasification and Ash Handling |
5-9 |
| Unit 31 - Shift Conversion |
5-13 |
| Unit 32 - Acid Gas Removal |
5-17 |
| Unit 41 - Methanol Synthesis and Refining |
5-21 |
| |
Methanol Synthesis |
5-21 |
Section 3
1133kb |
Methanol Refining |
5-25 |
| Unit 51 - Emission Control Systems |
5-29 |
| |
Claus Sulfur Plant |
5-29 |
| Sulfur Plant Tail Gas Treating Unit |
5-29 |
| Unit 61 - Steam and Power Generation |
5-30 |
| Unit 71 - Product Storage and Shipping |
5-35 |
| Unit 81 - Utilities |
5-36 |
| |
Raw Water Storage and Filtration |
5-36 |
| Boiler Feedwater Preparation |
5-37 |
| Cooling Tower and Cooling-Water System |
5-37 |
| Utility and Potable Water Systems |
5-38 |
| Fire Water System |
5-38 |
| Plant Air, Instrument Air, and Inert Gas Systems |
5-38 |
| Flare Systems |
5-39 |
| Storm Water Collection |
5-39 |
| Oily Water Treatment |
5-39 |
| Sanitary Treatment |
5-39 |
| Unit 91 - Off Sites |
5-43 |
| |
Electrical Systems |
5-43 |
| Interconnecting Piping |
5-43 |
| Site Preparation |
5-43 |
| Perimeter Fencing |
5-44 |
| Roads and Parking Areas |
5-44 |
| Maintenance Equipment |
5-44 |
| Laboratory Equipment |
5-44 |
| Mobile Equipment |
5-45 |
| Fire Protection Equipment |
5-45 |
| Buildings and Furnishings |
5-45 |
| Communications System |
5-45 |
| Railroads |
5-45 |
Section 4
1102kb |
6 |
Capital Cost Estimates and Economic Evaluation |
6-1 |
| |
|
Basis of Evaluation |
6-1 |
| Plant Investment |
6-14 |
| |
Estimating Basis |
6-14 |
| Capital Cost Presentation |
6-15 |
| Total Capital Requirement |
6-19 |
| Operating Requirements |
6-19 |
| Product Costs |
6-19 |
Section 5
1424kb |
7 |
Critical Areas of the Design |
7-1 |
|
8 |
Conclusions and Recommendations |
8-1 |
|
Appendix |
A-1 |
| |