Return to DOE Report Table of Contents
Return to
Process Development Unit Table of Contents
Liquid Phase Methanol LaPorte Process Development Unit:
Modification, Operation, and Support Studies.
Topical Report for the Period
April 8, 1987-March 9, 1991. Task 2.0: Run E-5, Gas Hold-up and Equipment
Evaluation Studies - 1991
Air Products and Chemicals
Table of Contents
|
I |
Executive Summary |
1 |
|
II |
Introduction and Background |
4 |
| |
A |
Process Development Scale Experience |
4 |
|
B |
LPMEOH I and II Operations |
6 |
|
III |
LaPorte LPMEOH PDU |
10 |
| |
A |
Existing PDU Process Description |
10 |
|
B |
New PDU Process Design |
10 |
|
IV |
Gas Holdup Study |
26 |
|
V |
Equipment Evaluation Run (Run E-5) |
37 |
| |
A |
Introduction |
37 |
|
B |
In-Situ Activation |
37 |
|
C |
Methanol Synthesis Operation |
40 |
|
D |
Discussion of Results |
40 |
| |
Internal Heat Exchanger Evaluation |
51 |
| Analytical Results and Activity Testing |
55 |
| Product Methanol Composition |
58 |
| Carbonyls |
58 |
| Alternate Oil Evaluation |
58 |
| Post Run Inspection |
62 |
|
VI |
Conclusions and Recommendations |
63 |
|
VII |
References |
64 |
|
VIII |
Appendices |
| |
A |
Nuclear Density Gauge Calibrations |
|
B |
E-5 Detailed Data Acquisition Sheets |
|