| ABSTRACT |
4 |
| 1 |
Executive Summary |
5 |
| |
1.1 |
Gasifier Modeling |
5 |
| 1.2 |
ASPEN Modeling |
6 |
| 1.3 |
Feedstock Assessment |
6 |
| 1.4 |
Conceptual Plant Design |
6 |
| 1.5 |
Economic and Financial
Analysis |
7 |
| 1.6 |
R&D Roadmap |
7 |
| 2 |
Process Overview |
8 |
| |
2.1 |
Technology Background |
8 |
| 2.2 |
Gasifier Technology Overview |
8 |
| 2.3 |
Design Basis |
9 |
| 2.4 |
Process Description |
10 |
| |
2.4.1 |
Fuel Preparation |
10 |
| 2.4.2 |
Gasification Process |
10 |
| 2.4.3 |
Heat Recovery / Steam Generation from
Syngas |
11 |
| 2.4.4 |
Syngas Cleaning |
11 |
| 2.4.5 |
Power Generation - Gas Turbine |
11 |
| 2.4.6 |
Power Generation - Steam Turbine |
12 |
| 2.4.7 |
Parasitic Site Loads |
12 |
| 3 |
Process Modeling |
12 |
| |
3.1 |
Gasifier Model |
13 |
| 3.2 |
Aspen Model |
13 |
| 4 |
Technical, Environmental
and Economic Performance |
14 |
| |
4.1 |
Technical Performance |
15 |
| 4.2 |
Environmental Performance |
16 |
| 4.3 |
Economic Analysis |
18 |
| |
4.3.1 |
Capital and O&M Costs |
19 |
| 4.3.2 |
Cost of Fuel / Cost of Electricity |
19 |
| 5 |
Technology Development
Roadmap |
21 |
| |
5.1 |
Technology Development
Phases |
21 |
| 6 |
Market Analysis |
23 |
| 7 |
National Benefits |
24 |
| 8 |
Implementation Plan |
25 |
| 9 |
Conclusion |
25 |
| |
| LIST OF FIGURES |
| Figure 1 |
Simplified Block Flow
Diagram |
7 |
| Figure 2 |
3-Dimensional AutoCAD Model
Plant Layout 10 Process Flow Diagram of EBGPS Combined Cycle (11x17
foldout) end of document Process Flow Diagram of EBGPS Fuel Cell
(11x17 foldout) end of document 3-D AutoCAD Model Layout of EBGPS
IGCC (11x17 foldout) |
28 |
| |
|
LIST OF TABLES |
| Table 1 |
Solicitation Objectives /
Emery's Accomplishments |
14 |
| Table 2 |
Emery Gasifier power and
efficiency ASPEN modeling predictions |
16 |
| Table 3 |
ASPEN Stack gas composition
and emission predictions |
17 |
| Table 4 |
Plant Capital Costs
Compared to NGCC Costs |
19 |
| Table 5 |
Cost of Electricity as a
Function of the Cost of Fuel in 2002 Dollars |
20 |