Table of Contents

GELSENBERG

 

 

 

 

TOM REEL

BAG

ITEM

FRAMES

AMMONIA and hydrogen sulfide recovery, Gelsenberg, drawing 2148-8

 89

 2746

 8

 30 ‘29

AMMONIUM sulfate plant, BK 922-8, drawing

89

2747

32

0 ‘13

BALANCES, monthly total for coal, catalysts, oil, 1941

 3

 2745

 2

 30 ’41-30 ‘50

i-BUTANE plant and stripping, monthly statements of, 1941

3

 2745

 7

 40 ‘1-40 ‘8

CATALYST 5058, log of, drawing

89

2747

43 & 44

0 ‘24-0 ‘25

CATCHPOT, cold, Gelsenberg, No. 4043 Ia-2, drawing

 89

 2747

 89

20 ‘15-20 ‘19

              , cold, Gelsenberg, N 4047 I-2, drawing

89

2747

97

20 ’50-20 ‘54

              , hot, Gelsenberg, N 1717-1, drawing

89

2747

86

20 ‘1-20 ‘4

              , 700 atm, drawing, 1326a-4

89

2746

15

50 ‘24

CENTRIFUGE plant, monthly summaries

3

2745

10

40 ’34-40 ‘57

CENTRIFUGES, high pressure process and operations, summary of, graph

 89

2747

 56

 0 ‘37

COAL preparation, flow diagram of, BK 357d-8

89

2747

67

10 ‘9

COMPRESSOR, Linde air, flow diagram of, 1284-2

 89

 2746

 17

50 ‘29-50 ‘33

CONVERTER, liquid phase, Gelsenberg, N 1510-1, drawing

 89

 2747

 85

10 ‘53-10 ‘56

              , liquid phase, N 1503-1, drawing

89

2747

93

20 ‘33-20 ‘36

              , liquid phase, 700 atm, drawing N 2585-7

 89

 2746

 19

 50 ‘39-50 ‘42

              ,  vapor phase, N 3784a-1 drawing

89

2747

94

20 ‘37-20 ‘40

COOLER, gas, drawing N 4748-2

89

2747

98

20 ‘55-20 ‘59

              , drawing, N 4750a-2, N 4741-2

89

2747

87

20 ‘5-20 ‘14

CRACKING, catalytic, production of 80,000 te/mo of aviation gasoline by

 164

 

 

271-274

EFFICIENCY, calorific, in the production of aviation gasoline from bituminous coal

 214

 

 

60 ‘9-60 ‘27

EQUIPMENT of the prehydrogenation stall 302 in Gelsenberg

 3

 2745

 18

 60 ‘66-60 ‘68