Section 1
314kb |
Acknowledgements |
iii |
| Abstract |
1 |
| Summary |
2 |
| |
Capsule Summary |
2 |
| Executive Summary |
3 |
Section 2
419kb |
1 |
Resources, Policies and Programs |
15 |
| |
1.1 |
Australia |
15 |
| 1.2 |
Federal Republic of Germany |
24 |
| |
1.2.1 |
Gasification programs |
26 |
Section 3
507kb |
1.2.2 |
Liquefaction programs |
36 |
|
1.3 |
Japan |
40 |
| |
1.3.1 |
National energy programs--Sunshine project |
41 |
| 1.3.2 |
Coal conversion process development |
41 |
| 1.3.3 |
Industrial activities and foreign cooperative project |
44 |
| 1.4 |
New Zealand |
45 |
| 1.5 |
South Africa |
50 |
Section 4
457kb |
1.6 |
United Kingdom |
59 |
| |
1.6.1 |
British Gas 20 year plant for SNG development |
66 |
| 1.6.2 |
Plan for commercialization |
67 |
| 1.6.3 |
Future programs |
68 |
| 1.6.4 |
NCB Low-Btu |
70 |
| 1.6.5 |
NCB COGAS work |
70 |
| 1.6.6 |
Esso chemically active fluid bed gasification process |
71 |
| 1.6.7 |
Use of slagging gasifier for electric power generation |
71 |
| 1.6.8 |
Underground gasification |
72 |
| 1.6.9 |
HCM process |
72 |
|
1.7 |
References |
75 |
Section 5
563kb |
2 |
Liquefaction |
84 |
| |
2.1 |
Indirect Liquefaction |
87 |
| |
2.1.1 |
Methanol synthesis |
88 |
| 2.1.2 |
Methanol-to-gasoline |
91 |
| 2.1.3 |
Direct syngas-to-gasoline |
98 |
| 2.1.4 |
Liquid-phase Fischer-Tropsch |
102 |
Section 6
332kb |
2.2 |
Direct Liquefaction |
112 |
| |
2.2.1 |
Liquid solvent extraction |
113 |
| 2.2.2 |
Supercritical gas extraction |
121 |
Section 7
664kb |
2.2.3 |
Ruhrkohle AG/Veba Oel AG coal hydrogenation plant |
130 |
| 2.2.4 |
Saarberg coal liquefaction pilot plant |
145 |
| 2.2.5 |
Rheinbraun brown coal liquefaction test plant |
156 |
Section 8
192kb |
2.2.6 |
Solvolysis liquefaction |
163 |
| 2.2.7 |
Extraction liquefaction |
166 |
| 2.2.8 |
Direct hydrogenation liquefaction |
169 |
Section 9
770kb |
2.3 |
Gasifiers Associated with Direct Liquefaction |
173 |
| |
2.3.1 |
Koppers-Totzek process |
173 |
| 2.3.2 |
Shell-Koppers process |
203 |
Section 10
495kb |
2.3.3 |
Texaco process |
213 |
| 2.3.4 |
Saarberg-Otto process |
220 |
Section 11
389kb |
2.3.5 |
British gas/slagging lurgi process |
236 |
|
2.4 |
References |
249 |
Section 12
404kb |
3 |
Specific Process Unit Development Efforts |
258 |
| |
3.1 |
Pumps for coal liquefaction plants |
258 |
| 3.2 |
Heat recovery systems |
262 |
| 3.3 |
Solid-liquid separation |
263 |
| 3.4 |
Pressure letdown valves |
266 |
| 3.5 |
Gasifier coal feed systems |
267 |
| 3.6 |
Compressors |
269 |
| 3.7 |
Waste heat boilers |
271 |
| 3.8 |
Acid gas removal systems |
272 |
| 3.9 |
References |
274 |
|
4 |
Materials of Construction |
275 |
Section 13
571kb |
|
4.1 |
Gasification |
278 |
| 4.2 |
Liquefaction |
278 |
| |
4.2.1 |
Valves and pumps--a generic problem |
285 |
| 4.2.2 |
Slurry preheating |
286 |
| 4.2.3 |
Pressure vessels |
287 |
| 4.3 |
Summary of material findings |
293 |
| 4.4 |
References |
296 |
Section 14
543kb |
Appendix A |
299 |
| Appendix B |
309 |
| Appendix C |
317 |
| References |
331 |